TY - JOUR
T1 - Zero valent iron remediation of a mixed brominated ethene contaminated groundwater
AU - Cohen, E.L.
AU - Patterson, B.M.
AU - Mckinley, Allan
AU - Prommer, Henning
PY - 2009
Y1 - 2009
N2 - The suitability of a granulated zero valent iron (ZVI) permeable reactive barrier (PRB) remediation strategy was investigated for tribromoethene (TriBE), cis-1,2-dibromoethene (c-DBE), trans-1,2-dibromoethene (t-DBE) and vinyl bromide (VB), via batch and large-scale column experiments that were subsequently analysed by reactive transport modelling.The brominated ethenes in both batch and large-scale column experiments showed rapid (compared to controls and natural attenuation) degradation in the presence of ZVI. In the large-scale column experiment, degradation half-lives were 0.35 days for TriBE, 0.50 days for c-DBE, 0.31 days for t-DBE and 0.40 days for VB, under site groundwater flow conditions, resulting in removal of brominated ethenes within the first 0.2 m of a 1.0 m thick ZVI layer, indicating that a PRB groundwater remediation strategy using ZVI could be used successfully.In the model simulations of the ZVI induced brominated ethene degradation, assuming a dominant reductive β-elimination pathway via bromoacetylene and acetylene production, simulated organic compound concentrations corresponded well with both batch and large-scale column experimental data. Changes of inorganic reactants were also well captured by the simulations. The similar ZVI induced degradation pathway of TriBE and TCE suggests that outcomes from research on ZVI induced TCE remediation could also be applied to TriBE remediation.
AB - The suitability of a granulated zero valent iron (ZVI) permeable reactive barrier (PRB) remediation strategy was investigated for tribromoethene (TriBE), cis-1,2-dibromoethene (c-DBE), trans-1,2-dibromoethene (t-DBE) and vinyl bromide (VB), via batch and large-scale column experiments that were subsequently analysed by reactive transport modelling.The brominated ethenes in both batch and large-scale column experiments showed rapid (compared to controls and natural attenuation) degradation in the presence of ZVI. In the large-scale column experiment, degradation half-lives were 0.35 days for TriBE, 0.50 days for c-DBE, 0.31 days for t-DBE and 0.40 days for VB, under site groundwater flow conditions, resulting in removal of brominated ethenes within the first 0.2 m of a 1.0 m thick ZVI layer, indicating that a PRB groundwater remediation strategy using ZVI could be used successfully.In the model simulations of the ZVI induced brominated ethene degradation, assuming a dominant reductive β-elimination pathway via bromoacetylene and acetylene production, simulated organic compound concentrations corresponded well with both batch and large-scale column experimental data. Changes of inorganic reactants were also well captured by the simulations. The similar ZVI induced degradation pathway of TriBE and TCE suggests that outcomes from research on ZVI induced TCE remediation could also be applied to TriBE remediation.
U2 - 10.1016/j.jconhyd.2008.09.010
DO - 10.1016/j.jconhyd.2008.09.010
M3 - Article
C2 - 18990465
SN - 0169-7722
VL - 103
SP - 109
EP - 118
JO - Journal of Contaminant Hydrology
JF - Journal of Contaminant Hydrology
IS - 3-4
ER -