Projects per year
Abstract
© 2016 IOP Publishing Ltd Printed in the UK. We have carried out concurrent optical frequency measurements of the transitions in 171Yb, and in so doing have determined the frequency separation between the P3 0 (F12 = ) and P3 1 (F32 = ) levels with an uncertainty close to the ppb range. The knowledge of this frequency interval will aid experiments relying on the S P1 0 30 - line in 171Yb and 173Yb without access to highly accurate frequency standards.
Original language | English |
---|---|
Article number | 065004 |
Pages (from-to) | 1-8 |
Number of pages | 9 |
Journal | Journal of Physics B: Atomic, Molecular and Optical Physics |
Volume | 49 |
Issue number | 6 |
Early online date | 25 Nov 2015 |
DOIs | |
Publication status | Published - 7 Mar 2016 |
Fingerprint
Dive into the research topics of 'Clock and inter-combination line frequency separation in 171Yb'. Together they form a unique fingerprint.Projects
- 2 Finished
-
Ground Station Facility for the Atomic Clock Ensemble in Space Mission
Tobar, M. (Investigator 01), Luiten, A. (Investigator 02), Hartnett, J. (Investigator 03), Ivanov, E. (Investigator 04), Salomon, C. (Investigator 05), Featherstone, W. (Investigator 06), Teunissen, P. (Investigator 07), Vale, C. (Investigator 08), Hall, B. (Investigator 09) & Warrington, R. (Investigator 10)
ARC Australian Research Council , Curtin University, Swinburne University of Technology
1/01/11 → 30/06/15
Project: Research
-
A Southern Hemisphere Ground Station for the Atomic Clock Ensemble in Space Mission
McFerran, J. (Investigator 01)
ARC Australian Research Council
1/01/11 → 30/05/16
Project: Research