@inproceedings{639b92d245374f57bbfe4f0a16a44205,
title = "An Integrated Approach to the Lot Sizing and Cutting Stock Problems.",
author = "Muhammad Malik and Min Qiu and John Taplin",
year = "2009",
doi = "10.1109/IEEM.2009.5372960",
language = "English",
isbn = "9781424448708",
volume = "N/A",
pages = "1111--1115",
editor = "Farris and G and Pecht and M. and H-O Gunther and Li and C-L",
booktitle = "IEEM 2009 The IEEE International Conference on Industrial Engineering and Engineering Management",
publisher = "IEEE, Institute of Electrical and Electronics Engineers",
address = "United States",
edition = "HongKong, China",
note = "An Integrated Approach to the Lot Sizing and Cutting Stock Problems. ; Conference date: 01-01-2009",
}