An automated approach for optimizing monopile foundations for offshore wind turbines for serviceability and ultimate limit states design

Research output: Contribution to journalArticle

Abstract

Pile foundation design is conventionally conducted using a process of trial and error, where the dimensions of a pile are estimated and the performance is computed and compared with design criteria. The dimensions are varied and the process is repeated in order to converge to a safe and economical design. In this paper, this time-consuming and labor intensive process is replaced with an automated approach using the example case of an offshore monopile supporting a wind turbine. The optimum length and diameter of the monopile are determined with the aim of minimizing the pile weight while satisfying both serviceability and ultimate limit state criteria. The approach handles general soil and loading conditions and includes an ability to incorporate cyclic loading.

Original languageEnglish
Article number051901
JournalJournal of Offshore Mechanics and Arctic Engineering
Volume140
Issue number5
DOIs
Publication statusPublished - 1 Oct 2018

Fingerprint

Offshore wind turbines
Piles
Pile foundations
Wind turbines
Personnel
Soils

Cite this

@article{9510dcdb14754623a2d9a3ae5965ee84,
title = "An automated approach for optimizing monopile foundations for offshore wind turbines for serviceability and ultimate limit states design",
abstract = "Pile foundation design is conventionally conducted using a process of trial and error, where the dimensions of a pile are estimated and the performance is computed and compared with design criteria. The dimensions are varied and the process is repeated in order to converge to a safe and economical design. In this paper, this time-consuming and labor intensive process is replaced with an automated approach using the example case of an offshore monopile supporting a wind turbine. The optimum length and diameter of the monopile are determined with the aim of minimizing the pile weight while satisfying both serviceability and ultimate limit state criteria. The approach handles general soil and loading conditions and includes an ability to incorporate cyclic loading.",
keywords = "Laterally loaded piles, Monopile, Offshore wind, Optimization",
author = "Doherty, {James P.} and Lehane, {Barry M.}",
year = "2018",
month = "10",
day = "1",
doi = "10.1115/1.4039523",
language = "English",
volume = "140",
journal = "Journal of Offshore Mechanics and Arctic Engineering",
issn = "0892-7219",
publisher = "ASME International",
number = "5",

}

TY - JOUR

T1 - An automated approach for optimizing monopile foundations for offshore wind turbines for serviceability and ultimate limit states design

AU - Doherty, James P.

AU - Lehane, Barry M.

PY - 2018/10/1

Y1 - 2018/10/1

N2 - Pile foundation design is conventionally conducted using a process of trial and error, where the dimensions of a pile are estimated and the performance is computed and compared with design criteria. The dimensions are varied and the process is repeated in order to converge to a safe and economical design. In this paper, this time-consuming and labor intensive process is replaced with an automated approach using the example case of an offshore monopile supporting a wind turbine. The optimum length and diameter of the monopile are determined with the aim of minimizing the pile weight while satisfying both serviceability and ultimate limit state criteria. The approach handles general soil and loading conditions and includes an ability to incorporate cyclic loading.

AB - Pile foundation design is conventionally conducted using a process of trial and error, where the dimensions of a pile are estimated and the performance is computed and compared with design criteria. The dimensions are varied and the process is repeated in order to converge to a safe and economical design. In this paper, this time-consuming and labor intensive process is replaced with an automated approach using the example case of an offshore monopile supporting a wind turbine. The optimum length and diameter of the monopile are determined with the aim of minimizing the pile weight while satisfying both serviceability and ultimate limit state criteria. The approach handles general soil and loading conditions and includes an ability to incorporate cyclic loading.

KW - Laterally loaded piles

KW - Monopile

KW - Offshore wind

KW - Optimization

UR - http://www.scopus.com/inward/record.url?scp=85046544474&partnerID=8YFLogxK

U2 - 10.1115/1.4039523

DO - 10.1115/1.4039523

M3 - Article

VL - 140

JO - Journal of Offshore Mechanics and Arctic Engineering

JF - Journal of Offshore Mechanics and Arctic Engineering

SN - 0892-7219

IS - 5

M1 - 051901

ER -