Integrated lithostratigraphic-structural-alteration-fluid model for gold mineralization in the central corridor of the Guiana Shield

Project Details

StatusFinished
Effective start/end date17/11/1431/03/18

Funding

  • Troy Resources Limited, Australia: A$70,620.00