Design & Construction of a Passive Water Treatment System to Remediate Acid Groundwater at Yaldon Stud

  • Coles, Neil (Investigator 01)
  • Biermann, Vera (Investigator 02)
  • Lillicrap, Adam (Investigator 03)

Project Details

StatusFinished
Effective start/end date31/12/0730/12/08

Funding

  • Ellen Brockman Integrated Catchment Group: A$23,000.00