Projects per year
Projects
- 35 Finished
Search results
-
Finished
Effects of cyclic history on the ageing characteristics of driven piles in sand
Lehane, B. (Investigator 01)
11/05/20 → 10/05/21
Project: Research
-
Brunei Shell Petroleum - Study Into The Effects Of Pile Ageing For Platforms Offshore Brunei
Watson, P. (Investigator 01) & Lehane, B. (Investigator 02)
1/07/19 → 31/12/20
Project: Research
-
Soil structure interaction for multi-storey framed structures
Lehane, B. (Investigator 01)
1/05/19 → 30/04/20
Project: Research
-
Field research on effects of crowd force and torque on the installation resistance and static capacity of screw piles in sand (Phases 1 and 2)
Lehane, B. (Investigator 01)
20/03/19 → 19/03/20
Project: Research
-
Design methods to quantify lateral and rotational stiffness of short monopiles
Lehane, B. (Investigator 01) & Bransby, F. (Investigator 02)
7/01/19 → 6/01/20
Project: Research
-
A 21st century laboratory testing device for geotechnical engineering
Lehane, B. (Investigator 01), Doherty, J. (Investigator 02), Stanier, S. (Investigator 03) & White, D. (Investigator 04)
ARC Australian Research Council
1/01/18 → 31/12/23
Project: Research
-
Effects of Impact Frequency on the Response of Driven Pipe Piles in Sand to Static Axial and Lateral Loading
Lehane, B. (Investigator 01)
1/01/17 → 31/12/17
Project: Research
-
Midi ICP Testing - Collaborative Research Project with Imperial College London
Lehane, B. (Investigator 01)
Iberdrola Renovables Offshore Deutschland
1/01/15 → 31/12/15
Project: Research
-
KO4 FEL3 Soil Characterisation Studies Goro Nickel - New Caledonia
Lehane, B. (Investigator 01)
1/08/14 → 31/05/15
Project: Research
-
Reliability of API and CPT-based Axial Pile Capacity Design Methods
Lehane, B. (Investigator 01)
Norwegian Geotechnical Institute
1/01/14 → 31/12/21
Project: Research
-
Improving Foundation Design in Australian Residual Soils
Lehane, B. (Investigator 01)
1/01/13 → 31/12/15
Project: Research
-
Improving Foundation Design in Australian Residual Soils
Lehane, B. (Investigator 01)
1/01/13 → 31/12/15
Project: Research
-
Geotechnical Characteristics of the Sediments from the Cimatti Enfield Development
Lehane, B. (Investigator 01), Harb Carraro, J. A. (Investigator 02), Boukpeti, N. (Investigator 03) & Vulpe, C. (Investigator 04)
1/01/13 → 31/12/13
Project: Research
-
Soil & Characterisation studies at the Equus field for Hess
Lehane, B. (Investigator 01) & Harb Carraro, J. A. (Investigator 02)
17/02/12 → 31/12/13
Project: Research
-
The Behaviour of the Surficial Soils in Marginal Developments close to the Van Gogh Field using Samples from Coniston, Novara, Great East Spar and Balnaves
Lehane, B. (Investigator 01)
1/01/12 → 31/12/12
Project: Research
-
Advancing Laterally Loaded Pile Analysis
Lehane, B. (Investigator 01)
ARC Australian Research Council
1/01/12 → 31/12/16
Project: Research
-
Perforated Shallow Foundations Subject to Combined Loading
Lehane, B. (Investigator 01), Tapper, L. (Investigator 02) & Byrne, B. (Investigator 03)
1/01/11 → 31/12/11
Project: Research
-
Suction Caisson Extraction Failure Mode Study - P09118
Lehane, B. (Investigator 01)
1/01/11 → 31/12/12
Project: Research
-
2010 - Fabrication of Centrifuge Scale Pressuremeter
Lehane, B. (Investigator 01) & Doherty, J. (Investigator 02)
The University of Western Australia
1/01/10 → 31/12/10
Project: Research
-
CLP Meteorological Mast Instrumentation System for Suction Caissons
Lehane, B. (Investigator 01)
1/01/10 → 31/12/13
Project: Research
-
Turkmenistan
Gaudin, C. (Chief Investigator) & Lehane, B. (Chief Investigator)
1/01/08 → 31/12/08
Project: Research
-
DP0878897 - Ageing of Pile Shaft Friction in Sand
Lehane, B. (Chief Investigator)
1/01/08 → 31/12/10
Project: Research
-
Contract Research - Various Projects
Lehane, B. (Investigator 01)
31/12/07 → 30/12/08
Project: Research
-
-
Effects of Jetting During Installation of Pressed In Piles
Lehane, B. (Chief Investigator)
International Press In Association IPA UK
1/01/07 → 31/12/07
Project: Research
-
Centrifuge Modelling Experiments of Gyropile Installation and Loading
White, D. (Chief Investigator) & Lehane, B. (Chief Investigator)
1/01/07 → 31/12/07
Project: Research
-
-
-
-
Geotechnical and Soil-Structure Interaction Properties of Soils in Perth CBD
Lehane, B. (Chief Investigator)
1/01/05 → 31/12/08
Project: Research
-
Mechanisms controlling displacement Pile Behaviour in Sands.
Lehane, B. (Chief Investigator)
1/01/04 → 31/12/06
Project: Research
-
-
-
Strain and Deformation Patterns in Sand Beneath Shallow Foundations Subjected to Combined Loading
Lehane, B. (Chief Investigator)
The University of Western Australia
1/01/03 → 31/12/03
Project: Research
-
University of Southampton - Transmission Tower Foundation Uplift Centrifuge Tests.
Lehane, B. (Chief Investigator)
1/01/03 → 31/12/06
Project: Research