Projects per year
Projects
Search results
-
Finished
Investigation of the Thermal Performance of Rammed Earth Residential Buildings & Implications in Energy Saving Design
Ciancio, D., Cardell-Oliver, R., Huebner, C., Mahony, L. & Carpenter, D.
1/01/14 → 31/12/15
Project: Research
-
Investigation of the Thermal Performance of Rammed Earth Residential Buildings & Implications in Energy Saving Design
Ciancio, D., Cardell-Oliver, R., Huebner, C., Mahony, L. & Carpenter, D.
1/01/14 → 31/12/15
Project: Research
-
Investigation of the Thermal Performance of Rammed Earth Residential Buildings & Implications in Energy Saving Design
Ciancio, D., Cardell-Oliver, R., Huebner, C., Mahony, L. & Carpenter, D.
1/01/14 → 31/12/15
Project: Research
-
Numerical and Experimental Study of Pounding Damage of adjacent Bridge Structures to Spatially Varying Earthquake Ground Motions
Hao, H., Huang, T. & Ren, W.
1/01/12 → 31/12/14
Project: Research
-
Vulnerability mapping of hazards and economic loss assessment of offshore oil and gas platforms subject to accidental explosion and fires
Ma, G., Hao, H. & Gho, W.
1/01/11 → 31/12/13
Project: Research
-
Use of Rammed Earth in Aboriginal Communities of Australia
Ciancio, D., Fourie, A., Dobson, S. & Augarde, C.
1/01/11 → 31/12/13
Project: Research
-
Use of Rammed Earth in Aboriginal Communities of Australia
Ciancio, D., Fourie, A., Dobson, S. & Augarde, C.
1/01/11 → 31/12/13
Project: Research
-
Use of Rammed Earth in Aboriginal Communities of Australia
Ciancio, D., Fourie, A., Dobson, S. & Augarde, C.
1/01/11 → 31/12/13
Project: Research
-
Behaviour of Cementing Backfill in Full Scale Mining Stopes
Fourie, A., Doherty, J. & APAI, N. N.
1/07/10 → 31/12/13
Project: Research
-
Behaviour of Cementing Backfill in Full Scale Mining Stopes
Fourie, A., Fahey, M. & Doherty, J.
1/07/10 → 30/06/13
Project: Research
-
Behaviour of Cementing Backfill in Full Scale Mining Stopes
Fourie, A., Fahey, M. & Doherty, J.
1/07/10 → 30/06/13
Project: Research
-
On Bottom Stability of Large Diameter Submarine Pipelines
Cheng, L., White, D. & Randolph, M.
1/01/09 → 31/12/11
Project: Research
-
Whitfeld Incentive Award - Hossain
The University of Western Australia
26/09/08 → 31/12/08
Project: Research
-
Control of Vortex Shedding form a Circular Cylinder using Helical Strakes
1/01/08 → 31/12/08
Project: Research
-
-
-
Effects of Jetting During Installation of Pressed In Piles
International Press In Association IPA UK
1/01/07 → 31/12/07
Project: Research
-
-
DP0774061 - Blast Damage and Fragmentation Prediction for Occupants and Structure Protection
Hao, H.
1/01/07 → 31/12/09
Project: Research
-
Perform Tests for FRP and Steel Gas Pipelines under Internal Pressure
Kavanagh, K.
Australian Pipeline Industry Association Ltd (APIA)
1/01/07 → 31/12/07
Project: Research
-
-
-
-
Seismic Response of Partially Saturated Petroleum Reservoir Zones - Towards Quantitative Recovery Monitoring
Dyskin, A., Gurevich, B., Mueller, T. & Paterson, L.
1/01/07 → 31/12/09
Project: Research
-
-
Assessment of Scour Potential for Turkmenistan Block 1 Gas Development Project
1/01/07 → 31/12/07
Project: Research
-
CRC for Integrated Engineering Asset Management - Integrated Health Monitoring System for Civil Infrastructure in Operational Environments
Hao, H., Zhu, X., Deeks, A., Liu, W., Cheng, L., Stewart, M., Totoev, Y., Melchers, R., Thambiratnam, D., Mahendran, M. & Tan, A.
CRC for Integrated Engineering Asset Management
1/01/06 → 31/12/08
Project: Research
-
-
DP0557060 - Numerical Numbering of Three-dimensional Scour Below Offshore Pipelines
1/01/05 → 31/12/07
Project: Research
-
-
Fellowship UPRF: Novel Conditional Monitoring Strategies for Engineering Structures in Operational Environment
Zhu, Z.
University Postdoctoral Research Fellowships
1/01/05 → 31/12/07
Project: Research
-
-
-
Geotechnical and Soil-Structure Interaction Properties of Soils in Perth CBD
1/01/05 → 31/12/08
Project: Research
-
LP0562561 - Deep Penetrating Anchors - A Cost Effective Anchoring Solution for Mooring Oil and Gas Facilities in Deep Water
Randolph, M. & Hefer, P.
1/01/05 → 31/12/08
Project: Research
-
The Role of Defect Accumulation in Catastophic Rock Failure.
Dyskin, A. & Tarasov, B.
1/01/04 → 31/12/04
Project: Research
-
Deep Earth Resource Characterisation and Extraction - An Integrated Geoscience Approach.
Dyskin, A., Barrett, J., Fahey, M., Randolph, M., Galybin, A., Pasternak, E., Cassidy, M. & Tarasov, B.
1/01/04 → 31/12/04
Project: Research
-
-
-
Numerical Analysis of Dynamic Response and Damage of Frame Structures to Explosive Loads.
Hao, H.
1/01/04 → 31/12/06
Project: Research
-
Numerical Prediction of Train and Vehicle Induced Ground Vibrations and their Effects on Structures.
Deeks, A. & Hao, H.
1/01/04 → 31/12/06
Project: Research
-
-
2004060250 - Road Safety Barriers Made from Interlocking Blocks of Special Geometry.
Australian Transport Safety Bureau
1/01/04 → 31/12/04
Project: Research
-
Probabilistic Bridge Structure Condition Assessment and Load Carrying Capacity Prediction.
Hao, H., Deeks, A., Scanlon, R., Lim, A. & Smith, E.
1/01/04 → 31/12/06
Project: Research
-
-
Strain and Deformation Patterns in Sand Beneath Shallow Foundations Subjected to Combined Loading
1/01/03 → 31/12/03
Project: Research
-
-
University of Southampton - Transmission Tower Foundation Uplift Centrifuge Tests.
1/01/03 → 31/12/06
Project: Research
-
-